Concrete volume before bag count
Concrete demand starts with the shape being filled. A slab uses length, width and thickness. A round hole containing a round post uses the hole volume minus the post volume. Bag count then depends on mixed concrete yield, not dry bag weight alone.
Measure and calculate
- Choose slab, post-hole or volume-conversion mode.
- Enter dimensions in the displayed units; a radius is half the diameter.
- Use the mix yield for the exact bag weight before rounding upward.
Slab bags = ceiling(length in feet × width in feet × thickness in inches ÷ 12 ÷ bag yield).
A worked example
- Inputs
- A 12 by 10 ft slab is 4 in thick. Each 80 lb bag yields about 0.6 ft³.
- Calculation
Slab volume: 12 × 10 × 4 ÷ 12 = 40 ft³. Bags: ceiling(40 ÷ 0.6) = 67.- Result
- 67 bag
The result is 67 bags before any separately specified allowance. This estimates a chosen geometry; it does not determine slab thickness, footing depth or structural suitability.
Read the result
| Output or check | What it means for your project |
|---|---|
| Slab volume and bags | Slab thickness is entered in inches; length and width are in feet. Convert volume to bags using the exact product yield before rounding upward. |
| Post-hole volume | The annular model subtracts the post’s cross-section from the circular hole, then multiplies by hole depth. Enter radii, not diameters. |
| Geometry versus design | The tool estimates the dimensions you enter. It does not select slab thickness, hole depth or a structurally suitable concrete specification. |
Common questions
Is hole radius the same as hole diameter?
No. A 12 in diameter hole has a 6 in radius, entered here as 0.5 ft. Using the diameter as a radius quadruples the circular area.
Why can different bag weights change the answer?
Bag count uses the product’s mixed volume yield. Select the yield for the actual product and package size, not a general weight-to-volume conversion.
